Education |
MS Civil Engineering, Structures Option, 1991 University of the Philippines BS Civil Engineering, 1983 University of the Philippines |
Professional Eligibility |
Registered Professional Civil Engineer, State of California Registered Professional Civil Engineer, State of Nevada Registered Philippine Civil Engineer |
Professional Experience | 22 years of structural engineering |
High Rise Buildings |
Sandhurst Las Vegas-North Tower Condominium, Nevada 35-story post-tensioned flat plate floors with concrete shear walls (building frame) system. Grand Tower Condominium, Makati City, Philippines 27-story dual frame system (concrete moment frames with concrete shear walls) Ivy League Square Condominium, Manila, Philippines 27-story dual frame system (concrete moment frames with concrete shear walls) |
Medium Rise Buildings |
Regent Hotel and Convention Center, Stockton, California 7-story post-tensioned flat plate floors with concrete shear walls (building frame) system Proposed ALOFT, Henderson, Nevada 6-story post-tensioned flat plate floors with concrete shear walls (building frame) system |
Office Buildings |
MGM Office Building Expansion, Las Vegas, Nevada Additional 2-story, with future 3rd level expansion, steel braced frame with concrete-topped metal deck floors system adjacent to an existing MGM Office Building Prestige Travel Office Building, Las Vegas, Nevada Two-story masonry building with plywood floors and roofing system. |
Commercial/Residential Buildings |
Flamingo Eastern Plaza, Las Vegas, Nevada Design of single-story masonry shear walls, foundations & loading docks. Eastern and Windmill Building B, Las Vegas, Nevada Single story wood structure with structural steel dome Family Dollar Store-Simmons and Family Dollar Store-Washington, Las Vegas, Nevada Single-story masonry structures with plywood diaphragms. Shopping Center @ Durango, Las Vegas, Nevada Single story wood structures Pads A, B, D, & G and masonry building Shop 1 |
Institutional Facilities |
High Desert State Prison Phase III, Indian Springs, Nevada Single story Gymnasium with masonry shear wall & open-web steel joists roof system Regional Animal Campus - Lied Animal Shelter, Las Vegas, Nevada Design of single story structures such as wood-framed Dog Bungalows, metal stud-framed Shelter Addition and masonry Barn and Apartments. Tim & Jackie Hafen Elementary School, Pahrump, Nevada Design of single story masonry structure utilizing long span structural steel roof joists. |
Industrial Buildings |
Yellow Checker Star Facility-Headquarters & Maintenance Bldgs., Las Vegas, Nevada Single-story structural steel building with steel roof joists & steel braced frames TYCOM Cable Stations in Piti Guam & Maili, Oahu, Hawaii Two-story & single story pre-cast concrete buildings with precast double-tee framing and pre-cast concrete shear walls. Bosowa Cement Project, Ujungpandang, South Sulawesi, Indonesia Structural design of Pyro-process structures such as Cyclone Pre-Heater Tower, Kiln Pier Foundations, Kiln Roof Structure and Tertiary Air Duct Supports. Hi-Cement Corporation Plant Expansion I & II (Wet & Dry Process), Philippines Structural design of Cyclone Pre-Heater Towers I & II, CF Silos, Cement & HFL Silos, Kiln Pier Foundations, Coal Mill Buildings, Conditioning Towers I & II, Electrostatic Precipitator, Clinker Cooler Building Expansion, Limestone Storage Buildings, 60m Steel Chimney, and Mill Foundations for Coal & Raw Mills. Pre-Engineered Steel Buildings utilizing the Butler Steel Building System, Saudi Arabia Structural design and supervision of production of shop & fabrication drawings for SADIPCO Pipe Factory, Liquid Tide Factory, Sceco workshop, and various shelter facilities for pilgrims. |
Rehabilitation/Retrofit Projects |
Love Boutique (Vegas Valley Retail Center), Las Vegas, Nevada Strengthening of the existing pre-engineered steel building moment frames. Sapphire(Sporting House Adult Entertainment Center), Las Vegas, Nevada Design of foundations and retrofitting of the existing footings for the addition of moment-framed mezzanine within the existing single story masonry building. Imperial Palace Monorail Access Bridge, Las Vegas, Nevada Strengthening of the existing parking building post-tensioned slabs for increased live loads. Eagle Medical Center, Carson City, Nevada Extension of the post-tensioned slab @ 3rd floor level & design of MRI RF Shielding Framing. |
Military Projects |
N62864-D-0090 Open End Contract, Various Structural Projects at Various Military Bases in the Philippines (Subic Naval Base & Wallace Air Station) Resistance of Subic Power Plant, Construct Crane Maintenance, Head Facility, Drone Facility, JATO Bottles/Igniter and Replace Bottom Plates of Fuel Tank, NSD |